![]() ![]() ![]() ![]() Pacific Amphitheater Remodel, Orange County Fairgrounds
The redesign of the Pacific Amphitheater required 3D scanning to develop a detailed solid model for acoustic design. A 2D survey, spot elevations and contours were created from the scan data for other design teams. TDR further provided construction layout staking services for the construction phase. Time: 5 – 6 weeks from scan to delivery ![]() ◀ Back
|
©2025 TDR Engineering (818) 761-1508 2566 N. San Fernando Road, Los Angeles CA 90065 | 501 W. Glenoaks Blvd. #145, Glendale CA 91202 |